SunLight2® LED Bulbs

SunLight2® LTF Builders Edition LED Bulbs

Total Lighting Supply proudly introduces the LTF Builders Edition Bulbs, T20/24 JA8 certified and UL listed. The builders edition Sunlight2 sets a new standard in LED lighting and offers exceptional features, including an extremely low flicker/strobing index, a crucial attribute for a health-focused light source.

Available in the following styles:

  • MR16 12v
  • GU10
  • PAR20
  • PAR30 LN

This new LED light source also boasts high lumens per watt, outstanding color rendering, and a red spectrum saturation that surpasses nearly every other light source in the industry. With a high CRI of over 90, excellent dimming range, and unmatched reliability, these bulbs are not only cost-effective but also meet or exceed Title 20, Title 24, and JA8 standards.

For those seeking a top-tier, energy-efficient lighting source that complies with JA8 and Title 24 requirements, the LTF Builders Edition is the ultimate solution. The JA8 designation refers to the 2016 revisions of California’s Title 24 regulations, effective as of January 2017. These regulations encompass indoor and outdoor lighting in new constructions, renovations, and additions to residential and nonresidential buildings. Given California's influential energy policies and significant population, the state plays a crucial role in advocating for lighting products that meet the requirements set by the California Energy Commission.

The majority of the JA8 revisions relate to residential lighting, encompassing single-family buildings, high-rise multifamily residential units, hotel and motel rooms, student dorms, senior housing, police stations, and fire stations. The LTF Builders Edition not only meets all of these requirements but is also approved and listed by UL, Energy Star, RoHS, and CE, as well as both Title 20 and Title 24. Additionally, it boasts the best warranty in the industry and is created by a team of engineers, product designers, and representatives who are proud to be born and raised in the United States.

A word to the wise: Do not schedule your installation date until you have received and accounted for all items needed for your project. Please plan accordingly!

Items 1 to 12 of 16 total

per page
Page:
  1. 1
  2. 2

Set Descending Direction

Items 1 to 12 of 16 total

per page
Page:
  1. 1
  2. 2

Set Descending Direction